EURELO Industrial Group (EIG) › Projects › 21-tonne hyperbaric chamber lifted into a hospital
Medical · Heavy rigging

21-tonne hyperbaric chamber lifted into a hospital

HAUX chamber for Techtronic · healthcare facility, Opole

Case study

The project

Challenge
A 21 t chamber measuring 8 × 3 × 2.5 m had to be lifted through a dedicated opening into a technical room of a healthcare building.
What we did
Unloading, internal transport, crane lift through the technological opening and precise final positioning, plus handling of all peripheral equipment.
Result
Chamber and equipment installed exactly to requirements, so commissioning started without delay.
21 tchamber
8 mlong
1week
ClientHAUX chamber for Techtronic
LocationOpole, Poland
Timeline1 week
DatesOctober 2025

Scope of work

  • Unloading of the chamber and peripheral equipment
  • Transport of components to the technical room
  • Lift through a dedicated technological opening
  • Precise positioning at the final location

Equipment on site: 100–150 t mobile crane · 3.5 t forklift · 3 t mobile gantry · rigging and installation tools

21-tonne hyperbaric chamber lifted into a hospital21-tonne hyperbaric chamber lifted into a hospital21-tonne hyperbaric chamber lifted into a hospital
Relocation calculator

Budget range in 60 seconds

Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.

Start a project

Tell us what moves. We'll plan the rest.

Get a quote →
EURELO project deskQuick answers · a project manager replies within one working day