EURELO Industrial Group (EIG) › Projects › Industrial slitter line moved from Germany to Denmark
Packaging & label materials · Relocation
Industrial slitter line moved from Germany to Denmark
Avery Dennison · Gotha (DE) → Hedehusene (DK)
Case study
The project
- Challenge
- A slitter line with complex mechanical, hydraulic, pneumatic and electrical systems had to move across a border within a compressed shutdown and start-up window.
- What we did
- Turnkey relocation: full mechanical and electrical dismantling, marking and packing, international road transport, reinstallation, levelling, anchoring, alignment and start-up support.
- Result
- Line reassembled and aligned in Denmark and supported through start-up on schedule.
8weeks door to door
2countries
3TIR transport units
Scope of work
- Complete mechanical & electrical dismantling
- Equipment marking, packing and transport preparation
- International road transport and unloading
- Mechanical & electrical reinstallation
- Machine levelling, anchoring and alignment
- Commissioning and start-up support
Equipment on site: 30 t crane truck · 6 t Manitou telehandler · cherry picker & scissor lift · 3 TIR transport units



More projects
Similar work
USAOEM
EV batteries · OEM installation
Battery production line installation in Indiana
Samsung · new battery plant, Indiana, USARead the case study →N. AmericaEurope
Automotive · International relocation
Production equipment moved from Mexico to Poland
Maflow · Mexico → Toruń, PolandRead the case study →USAIndia
Industrial solutions · International relocation
40+ tonnes of machinery moved from the USA to India
Vesuvius · USA → IndiaRead the case study →Relocation calculator
Budget range in 60 seconds
Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.