EURELO Industrial Group · Europe · North America · IndiaCareersContact
Budget CalculatorContactGet a quote

Language

EURELO Industrial Group (EIG) › Projects › Battery production line installation in Indiana
EV batteries · OEM installation

Battery production line installation in Indiana

Samsung · new battery plant, Indiana, USA

Case study

The project

Challenge
New battery production equipment shipped from Korea to the USA in 350 × 40 ft containers had to be offloaded, unpacked, positioned and assembled to OEM standards.
What we did
Container offloading, crate removal, internal moves and positioning, then mechanical assembly of the anode and cathode lines under OEM supervision, with support through commissioning.
Result
A high-volume installation handled seamlessly from container to commissioning, in close cooperation with the OEM team.
350× 40 ft containers
12weeks
2lines: anode + cathode
ClientSamsung
LocationIndiana, USA
Timeline12 weeks
Dates2024

Scope of work

  • Offloading and handling of 350 × 40 ft containers
  • Removal and unpacking of wooden equipment crates
  • Internal relocation and positioning of machinery
  • Mechanical assembly of anode and cathode production lines under OEM supervision
  • Support during commissioning
  • Removal of packing materials and final machinery cleaning
Battery production line installation in IndianaBattery production line installation in IndianaBattery production line installation in Indiana
Relocation calculator

Budget range in 60 seconds

Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.

Start a project

Tell us what moves. We'll plan the rest.

Get a quote →
EURELO project deskQuick answers · a project manager replies within one working day