The project
- Challenge
- An interconnected mixer system with pneumatics, hoppers, conveyors and steel platforms had to come out safely inside an active plant, with minimum downtime.
- What we did
- Dismantling of the mixer, pneumatics, pipes, valves, hoppers, screw conveyor, steel beams, stairs and the first-floor platform, then installation of the new equipment to specification under EURELO supervision.
- Result
- New mixing equipment integrated precisely into the existing process.
4weeks
1live plant
1mixer system replaced
Scope of work
- Dismantling of the mixer system and supporting structure
- Removal of pneumatic components, pipes and valves
- Dismantling of hand-add stations and raw material hoppers
- Removal of structural beams, stairs and first-floor platform
- Installation of new equipment to client specification
- On-site supervision by EURELO specialists



More projects
Similar work
USAOEM
EV batteries · OEM installation
Battery production line installation in Indiana
Samsung · new battery plant, Indiana, USARead the case study →Europe
Packaging & label materials · Relocation
Industrial slitter line moved from Germany to Denmark
Avery Dennison · Gotha (DE) → Hedehusene (DK)Read the case study →N. AmericaEurope
Automotive · International relocation
Production equipment moved from Mexico to Poland
Maflow · Mexico → Toruń, PolandRead the case study →Relocation calculator
Budget range in 60 seconds
Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.