EURELO Industrial Group (EIG) › Projects › Snacks packing line rebuilt in three weeks
FMCG · Dismantling & installation
Snacks packing line rebuilt in three weeks
Kellanova · Project Monty roll-out, K5 European Snacks
Case study
The project
- Challenge
- An existing snacks packing line had to be dismantled and rebuilt with new and modified machinery in a short window.
- What we did
- Dismantling and removal of Gasser, Seamer and Disc Feeder machines and conveyors, electrical cabinet replacement, then assembly, positioning and anchoring of the new machinery.
- Result
- One integrated mechanical and electrical team took the line from dismantling to final installation smoothly.
3weeks
1integrated team
2disciplines
Scope of work
- Dismantling of Gasser, Seamer and Disc Feeder machines
- Removal of secondary packing conveyors and safety barriers
- Electrical cabinet disconnection and replacement on the mezzanine
- Assembly and positioning of new machinery
- Installation of modified Quality Street components
- Final anchoring of machines and conveyors


More projects
Similar work
USAOEM
EV batteries · OEM installation
Battery production line installation in Indiana
Samsung · new battery plant, Indiana, USARead the case study →Europe
Packaging & label materials · Relocation
Industrial slitter line moved from Germany to Denmark
Avery Dennison · Gotha (DE) → Hedehusene (DK)Read the case study →N. AmericaEurope
Automotive · International relocation
Production equipment moved from Mexico to Poland
Maflow · Mexico → Toruń, PolandRead the case study →Relocation calculator
Budget range in 60 seconds
Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.