EURELO Industrial Group (EIG) › Projects › Metal separation line installed at a steelworks
Steel · OEM installation

Metal separation line installed at a steelworks

Bianna Recycling for CELSA Huta Ostrowiec · Poland

Case study

The project

Challenge
A metal separation line had to be installed and commissioned inside an active steel production site, with heavy process equipment and many trades on site.
What we did
Mechanical installation of the Bianna separation line, positioning and alignment, three conveyor sections, welding support and site supervision, then mechanical support during commissioning under OEM and client supervision.
Result
Line prepared for commissioning and supported through start-up to operation.
12weeks on site
3conveyor sections
1live steel plant
ClientBianna Recycling for CELSA Huta Ostrowiec
LocationOstrowiec Świętokrzyski, Poland
Timeline8 + 4 weeks
DatesJuly – October 2025

Scope of work

  • Mechanical installation of the Bianna metal separation line
  • Assembly, positioning and alignment of process equipment
  • Installation and connection of three conveyor sections
  • Certified welding personnel and equipment
  • Commissioning support under OEM and client supervision
  • Access, lifting and installation equipment, consumables and HSE materials
Metal separation line installed at a steelworksMetal separation line installed at a steelworksMetal separation line installed at a steelworks
Relocation calculator

Budget range in 60 seconds

Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.

Start a project

Tell us what moves. We'll plan the rest.

Get a quote →
EURELO project deskQuick answers · a project manager replies within one working day