EURELO Industrial Group (EIG) › Projects › Metal separation line installed at a steelworks
Steel · OEM installation
Metal separation line installed at a steelworks
Bianna Recycling for CELSA Huta Ostrowiec · Poland
Case study
The project
- Challenge
- A metal separation line had to be installed and commissioned inside an active steel production site, with heavy process equipment and many trades on site.
- What we did
- Mechanical installation of the Bianna separation line, positioning and alignment, three conveyor sections, welding support and site supervision, then mechanical support during commissioning under OEM and client supervision.
- Result
- Line prepared for commissioning and supported through start-up to operation.
12weeks on site
3conveyor sections
1live steel plant
Scope of work
- Mechanical installation of the Bianna metal separation line
- Assembly, positioning and alignment of process equipment
- Installation and connection of three conveyor sections
- Certified welding personnel and equipment
- Commissioning support under OEM and client supervision
- Access, lifting and installation equipment, consumables and HSE materials



More projects
Similar work
USAOEM
EV batteries · OEM installation
Battery production line installation in Indiana
Samsung · new battery plant, Indiana, USARead the case study →Europe
Packaging & label materials · Relocation
Industrial slitter line moved from Germany to Denmark
Avery Dennison · Gotha (DE) → Hedehusene (DK)Read the case study →N. AmericaEurope
Automotive · International relocation
Production equipment moved from Mexico to Poland
Maflow · Mexico → Toruń, PolandRead the case study →Relocation calculator
Budget range in 60 seconds
Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.