EURELO Industrial Group (EIG) › Projects › Press and liner line installed at Ball in Lublin
Packaging · Heavy rigging & installation
Press and liner line installed at Ball in Lublin
Ball Packaging Europe · Lublin, Poland
Case study
The project
- Challenge
- Components weighing up to 38 tonnes had to be unloaded, moved and installed inside a live production plant, on schedule for commissioning.
- What we did
- Unloading, internal transport, precision positioning and mechanical installation of a shell press with uncoiler, 6 liners and 3 conversion presses with uncoilers, supervised on site by EURELO specialists.
- Result
- Equipment installed, aligned and ready for commissioning and production expansion.
38 theaviest component
10machines installed
20weeks
Scope of work
- Unloading of production equipment, components up to 38 t
- Internal transport to installation areas
- Mechanical installation: 1 shell press with uncoiler, 6 liners, 3 conversion presses with uncoilers
- Precision positioning and alignment
- On-site supervision by EURELO specialists



More projects
Similar work
USAOEM
EV batteries · OEM installation
Battery production line installation in Indiana
Samsung · new battery plant, Indiana, USARead the case study →Europe
Packaging & label materials · Relocation
Industrial slitter line moved from Germany to Denmark
Avery Dennison · Gotha (DE) → Hedehusene (DK)Read the case study →N. AmericaEurope
Automotive · International relocation
Production equipment moved from Mexico to Poland
Maflow · Mexico → Toruń, PolandRead the case study →Relocation calculator
Budget range in 60 seconds
Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.