The project

Challenge
Components weighing up to 38 tonnes had to be unloaded, moved and installed inside a live production plant, on schedule for commissioning.
What we did
Unloading, internal transport, precision positioning and mechanical installation of a shell press with uncoiler, 6 liners and 3 conversion presses with uncoilers, supervised on site by EURELO specialists.
Result
Equipment installed, aligned and ready for commissioning and production expansion.
38 theaviest component
10machines installed
20weeks
ClientBall Packaging Europe
LocationLublin, Poland
Timeline20 weeks
DatesMay – September 2026

Scope of work

  • Unloading of production equipment, components up to 38 t
  • Internal transport to installation areas
  • Mechanical installation: 1 shell press with uncoiler, 6 liners, 3 conversion presses with uncoilers
  • Precision positioning and alignment
  • On-site supervision by EURELO specialists
Press and liner line installed at Ball in LublinPress and liner line installed at Ball in LublinPress and liner line installed at Ball in Lublin
Relocation calculator

Budget range in 60 seconds

Tell us what moves and where. You get an indicative range and a call-back from the right regional team. Every enquiry lands in CRM with its region.

Start a project

Tell us what moves. We'll plan the rest.

Get a quote →
EURELO project deskQuick answers · a project manager replies within one working day